Myth or reality
Myth: anyone can negotiate with a supplier
Procurement negotiation is not an inborn talent but a learnable profession. What professional negotiators do differently, and how to develop your team.
With a should-cost model you calculate what an item ought to cost, and take that number into the negotiation. Here is what it contains and how to build one.
ProcurePro 6 min read
The classic procurement negotiation goes like this: request five quotes, pick the best one, and haggle off a few more percent. This is often more ritual than negotiation. The real question is: how do you know the “best” offer is anywhere near a fair price?
Should-cost modeling answers that question. The idea is simple: you calculate yourself what the item ought to cost, and you take that number into the negotiation.
A basic model adds up six cost elements.
The sum is the should-cost price. It is not an exact copy of the supplier’s cost structure, but it is a very good starting point for negotiation.
Build the first model for an item with high spend, high complexity and little real competition. A custom machined part is a good choice; a screw ordered from a catalog is not.
You need the drawing or specification, the material grade, the weight and the tolerances. These tell you how much of which material is needed and which processing steps are required.
Cutting, turning, milling, welding, surface treatment, inspection. Estimate the machine and time for each step. Your own engineers or a manufacturing engineer are the best help here.
Raw material prices, industrial labor rates, machine rates, energy prices. This data is freely available; it just has to be collected. Always use data for the region where the supplier manufactures.
If the quoted price is close to the model, the supplier is pricing fairly. If it is well above, look for the element where the gap could be.
The cheapest offer alone does not prove the price is right, as we discuss in our article on the cheapest offer myth.
Do not open with the total. If you say “we think this should be 20% cheaper”, the supplier gets defensive. Go through the cost elements and ask where you see a gap. “By our calculation, material costs this much. What makes it higher on your side?” That question calls for a real answer, and it often turns out the supplier knows a more efficient solution, or the specification contains something that makes the item more expensive than it needs to be.
We write more about negotiation in our article on negotiation myths.
A should-cost model is not just for one negotiation. Once it is built, it can be used for the whole term of the contract.
Raw material indexing. If the model tells you what share of an item’s price is raw material, you can link that share to a public price index in the contract. When the price of steel or aluminum moves, the price follows automatically in both directions, with no renegotiation every time.
Handling price increase requests. If the supplier asks for an increase, you can check in the model which cost element changed, and by how much. A rise in energy prices, for example, justifies an increase only in the energy share, not across the whole price.
Pricing new products. A model for a similar part can be built from the existing one by changing a few parameters. That way you know during development what a new item could cost.
On complex items, in our projects we have seen 5–15% savings from introducing should-cost modeling alone. The benefit is not only in the price, though. Procurement goes into negotiations better prepared, its decisions can be justified, and the supplier relationship becomes more factual.
Building the first should-cost model takes manufacturing and market knowledge. With 41 years of combined multinational procurement experience, we build these models and join the negotiations too. See our procurement service, or request a free consultation.
Items with significant spend, high complexity and little real competition: custom-made parts, machined metal and plastic parts, assembled units. For standard catalog products, comparing market prices is simpler and enough.
Raw material prices are available from exchanges and industry sources, and statistics offices publish regional labor rates and energy prices. Machining times can be estimated from the drawing by your own engineers or an experienced manufacturing engineer.
You do not need to hand over the full model, but in the negotiation it helps to refer to its main elements: material, labor time, machine time. If the supplier's price differs significantly on one element, ask them to explain what causes the difference.
It does not need to be an exact copy of the supplier's cost structure. The goal is a good enough starting point to see which cost element is off, so you can ask about it specifically.
Myth or reality
Procurement negotiation is not an inborn talent but a learnable profession. What professional negotiators do differently, and how to develop your team.
Hackett Group's 2025 benchmark shows top procurement organizations run at lower cost and deliver more savings. What can your team take from it?
Problems and solutions
A faulty first delivery and a stopped production line. Six steps to supplier pre-qualification, from questionnaire to PPAP to contractual change control.