Procurement negotiation is not an inborn talent but a learnable profession. What professional negotiators do differently, and how to develop your team.
When a key person leaves, their knowledge leaves too. What usable process documentation contains, and how to keep it up to date.
ProcurePro 5 min read
At one of our clients, the lead buyer left after 11 years. Three days later it turned out that nobody else knew four critical processes. There was nothing written down about who starts them, which system they run in, or whom to call when they get stuck.
This is not an exception. In mid-sized companies it is closer to the rule. Processes live in the heads of experienced colleagues, and as long as those people are in place, everything works. The problem surfaces when someone leaves, is out for a longer period, or when new management after an ownership change tries to understand how the company actually runs.
When process documentation comes up, people usually think of one of three things:
None of these is documentation in the real sense. All three got finished, but none helps the person who wants to do the work tomorrow morning.
Good documentation has five parts. Not all of them need to be long, but all of them need to exist.
One page per process that lets anyone understand the essentials:
If you can’t write this one page, the process is probably not clear in the first place. For mapping inputs and outputs, a SIPOC process map is a good starting point.
This is the detailed description, usually called an SOP (standard operating procedure). It sets out step by step who does what, in which system and with which template. For software processes, with screenshots. The variants belong here too: “if the order value exceeds the budget, then…”, “if the supplier is not in the master data, then…”. These branches are exactly where new colleagues get stuck.
What do we measure on the process, where can the results be seen, and when and to whom do we report? If a process has no metric, nobody can say whether it works well.
What happens if an input is missing? What do you do in an emergency, when there is no time for the full process? Who has to be notified? Most documentation only describes the normal flow. In practice, exceptions take the most time, and the fewest people know how to handle them.
Where do requests come from, and where do outputs go? A procurement process starts with an engineering request and ends with a finance payment. If the handover points are not described, errors appear at the boundaries between departments.
Don’t make it 50 pages. For a medium-sized process, 5–15 pages is enough. If it is longer, it is too detailed and nobody will read it through.
Don’t store it as a PDF. Keep it on a live, searchable platform: an intranet, SharePoint, Confluence or whatever the company already uses. A PDF becomes an outdated copy after the first change.
Don’t update it once a year. Update it after every significant change. If the process changes often, build automation around it, for example by tying the documentation update to the approval of a system change.
Don’t let one person write it. The process owner is responsible, but writes it together with the people who carry it out. They know where practice differs from the plan.
Don’t lock it away. The main users of the documentation should be the people doing the daily work, not the auditors. If a buyer doesn’t open it when they get stuck, the documentation isn’t doing its job.
You don’t need to document every process at once. A workable first round looks like this:
Introducing documentation is itself a change: if colleagues don’t understand why it is needed, they won’t use it. We cover this in detail in our article on change management.
In our process development projects we write the documentation together with the people who run the processes, and we build it to be used in daily work, not just at the audit. See our process development service, or request a free consultation.
The one that only one person knows today, and whose failure would stop operations. In procurement this is often urgent ordering, supplier complaints, or a rarely run but critical annual process such as renewing framework agreements.
The process owner is responsible, but writes it together with the people who do the work. They are the ones who know where reality differs from the plan. An outside expert can help with structure and with keeping the pace.
Rarely. Audit material often describes how the process should work, not how it actually works. If the two differ, a new colleague will not be able to do the job from the description.
In a tool colleagues already open every day and where content is searchable: an intranet, SharePoint, Confluence or similar. A PDF sent around as an email attachment is out of date after the first change.
Myth or reality
Procurement negotiation is not an inborn talent but a learnable profession. What professional negotiators do differently, and how to develop your team.
Hackett Group's 2025 benchmark shows top procurement organizations run at lower cost and deliver more savings. What can your team take from it?
Problems and solutions
A faulty first delivery and a stopped production line. Six steps to supplier pre-qualification, from questionnaire to PPAP to contractual change control.
A free 30-minute call — then you decide. No sales process, no obligation.